Home page











Feedwater Limited
Tarran Way West
Tarran Estate
Moreton
WIRRAL
CH46 4TU

Telephone:
+44 151 606 0808
Fax:
+44 151 678 5459  

Registered in
England & Wales
Number 1274270
Search:
Cooling tower audits and inspections 
Cooling tower audits and inspections

A cooling tower audit proforma incorporates the assessment of the cooling tower phsysical condition, design and construction.
It examines the flow of water across the tower pack, whether it is of even distribution.
The removal of packing is now a requirement of all towers during chlorination where practicable. Our inspection reports will provide details of the cleaning proceedures .For those systems where pack removal is not possible, alternative cleaning methods will be recommended.

The inspection report will make improvement recomendations and show a photographic record of conditions within the system.




Auditing allows assesssment and highlights areas of improvement

Key Features
  • Auditing allows assessment of current status
  • and highlights areas of non compliance
  • Auditing can be used as leverage for capital funding
  • Auditing demonstraited the drive for improvement

 
Website developed by Polymorph Ltd